To suck the
09.12.2020 14:08
Wells with a depth of more than 10 m are prescribed when it is necessary to suck the plast.
The fighting of hydrogeological conditions is carried out using the above wells by measuring in each of them the depth of the appearance of water and the established level.
You have no rights to post comments