Heights to the
10.12.2020 18:57
Now let's try to more fully describe the design of the project:
Flame drawing of the existing situation
In the deadline, all bindings of windows and openings to window sills, heights to the ceilings in all rooms must be presented in the footing drawing.
You have no rights to post comments