08.12.2020 23:52
In addition, reserves are compiled by diameters on a normal scale.After the approval of the project assignment, t. e. selection of the option, detailed research is carried out for the development of a technical project: the geological structure and hydrogeological conditions along the highway are specified by additional drilling in the most dangerous places and engineering and geological survey to compile a card in a scale of 1: 10,000 or 1: 5000.